PB Heat EC Series Manuale Utente

Navigare online o scaricare Manuale Utente per Riscaldatori e bollitori per acqua PB Heat EC Series. PB Heat EC Series User's Manual Manuale Utente

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 27
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 0
EC/ECT
Boilers
Series
Oil
Installation,
Operation &
Maintenance
Manual
As an ENERGY STAR
®
Partner, PB Heat, LLC has determined that certain firing
rates of this product meet the ENERGY STAR
®
guidelines for energy efficiency.
Vedere la pagina 0
1 2 3 4 5 6 ... 26 27

Sommario

Pagina 1 - Maintenance

EC/ECTBoilersSeriesOilInstallation,Operation &MaintenanceManualAs an ENERGY STAR®Partner, PB Heat, LLC has determined that certain firing rates of

Pagina 2 - TABLE OF CONTENTS

8E. TANKLESS HEATER OR COVERPLATE1. If a tankless coil is used (item 13 or 17), install aspictured. On water boilers, install in opening in frontsecti

Pagina 3 - USING THIS MANUAL

9F. CONTROLS1. Water Boiler Controls:Install the limit / operating control, pressure-temperature gauge and safety relief valve. See Figure7.1 (Section

Pagina 4 - 1. PREINSTALLATION

10A. GENERALAll electrical wiring shall be done in accordance with theNational Electrical Code and Local Requirements. Singlepole switches including t

Pagina 5 - PREINSTALLATION

11Figure 4.3: Steam Boiler with Probe Low Water Cut-OffFigure 4.2: Steam Boiler with Float Low Water Cut-OffELECTRICAL

Pagina 6 - BOILER PLACEMENT AND ASSEMBLY

12ELECTRICALFigure 4.5: Zoning with CirculatorsFigure 4.4: Water Boilers

Pagina 7

13ELECTRICALFigure 4.6: Zoning with Zone ValvesFigure 4.7: Partner with Circulator

Pagina 8 - 3. PIPING AND CONTROLS

14BURNER SETUP & BOILER OPERATIONA. BURNER INSTALLATION1. The oil burner is supplied with a mounting flangefixed in position.2. Mount the burner t

Pagina 9

15BURNER SETUP & BOILER OPERATIONE. CLEAN THE BOILER(STEAM BOILERS ONLY)1. Clean the boiler within one week after initial start-up.Cleaning will b

Pagina 10 - PIPING AND CONTROLS

16BURNER SETUP & BOILER OPERATIONCARLIN BURNER SPECIFICATIONSBoiler Model No.Firing RateBurner Model No.Air ShutterNozzle SizePump PressureStart-u

Pagina 11

17MAINTENANCE6. MAINTENANCEWARNINGProduct Safety InformationRefractory Ceramic Fiber ProductThis appliance contains materials made from refractory cer

Pagina 12 - 4. ELECTRICAL

USING THIS MANUAL 1A. INSTALLATION CLEARANCE . . . . . . . . . . . . .1B. SPECIAL ATTENTION BOXES . . . . . . . . . . . .11. PREINSTALLATION 2A. CLEA

Pagina 13 - ELECTRICAL

18MAINTENANCEA. GENERAL1. Check pipes adjacent to cold walls or in unheatedspaces. Insulate and tape them if necessary to besure they can't freez

Pagina 14

19MAINTENANCE3. Remove any scale or soot from the combustionchamber area by vacuum cleaning or any otheravailable means.4. Replace flue collector and

Pagina 15

20BOILER DIMENSIONS & RATINGS7. BOILER DIMENSIONS & RATINGSTAPPING LOCATIONSLocation Size NPT Water SteamH 3/4" N/A Low Limit ControlI 3/

Pagina 16

21BOILER DIMENSIONS & RATINGSTable 7.1: Boiler Ratings✸ As an ENERGY STAR®Partner, PB Heat has determined that these firing rates meet the ENERGY

Pagina 17 - (STEAM BOILERS ONLY)

22REPAIR PARTS8. REPAIR PARTSRepair parts are available from your installer or by contacting PB Heat, LLC, 131 S.Church, Bally, PA 19503.Note: Remembe

Pagina 18

23NOTES

Pagina 20 - MAINTENANCE

EC/ECTBoilersSeriesOilInstallation,Operation &MaintenanceManualTO THE INSTALLER:This manual is the property of the owner and mustbe affixed near t

Pagina 21

1A. INSTALLATION CLEARANCEFollow the installation instructions provided in thismanual in the order shown. The order of theseinstructions has been set

Pagina 22 - DIMENSIONS

2A. CLEARANCESUnit may be installed on combustible flooring, provided theboiler is not set on carpet and a metal drip pan is placedunder the appliance

Pagina 23 - Series EC/ECT

3C. CHIMNEY / VENT AND DRAFT CONTROL1. Draft Requirement – Minimum draft required in thevent system is -.03" to -.05" W.C. depending onboile

Pagina 24 - 8. REPAIR PARTS

4A. SETTING THE BOILER1. Provide a level foundation, located as close aspossible to the center of the heating system.2. Refer to Figure 2.2 for explod

Pagina 25

5BOILER PLACEMENT AND ASSEMBLYFigure 2.2: Boiler Exploded View(See Table 8.1 in Section 8 for parts identification).

Pagina 26

6A. PRESSURE TEST BLOCK ASSEMBLY1. Make up cold water supply connection to the boiler.2. Install pressure gauge or pressure-temperature gaugein tappin

Pagina 27

7D. WATER BOILER PIPING1. Refer to the Water Installation Survey and HydronicsInstitute Residential Hydronic HeatingInstallation/Design Guide for Guid

Commenti su questo manuale

Nessun commento